دراسة لنمط متطلبات التدفق النقدي لمشاريع التشييد == A Study to The Pattern of Cash Flow Requirements for Construction Projects Performed by Contracting Companies of The Ministry of Housing and Construction Iraq

Author name: Sidqi Ismail Razzouqi
Supervisor name: Qasim M. K. Al-Kasis | Ahmad Jasim Dabdab
General topic: Civil Engineering
Degree: Doctorate
University: University of Baghdad
Language: English
University location: Baghdad

نظام معلومات اداري متكامل للتخطيط والسيطرة على المناهج الزمنية لتنفيذ المشاريع في القطاع النفطي في العراق == Management Information System ( M. I. S. ) for Planning and Schedule Control of Construction Projects in The Iraqi Oil Sector

Author name: Ihsan Ibrahim Mustafa Al-Attar
Supervisor name: Raji Z. Al-Ani | Falih H. Al-Khayat
General topic: Civil Engineering
Degree: Doctorate
University: University of Baghdad
Language: English
University location: Baghdad

Applying Construction Management Approach for Executing Construction Projects ( Iraq as Case Study )

Author name: Hayar Khalil Ibrahim Al-Abdaly
Supervisor name: Zuhair Naffe Al-Ani
General topic: Civil Engineering
Degree: Master
University: University of Baghdad
Language: English
University location: Baghdad

ادارة اوامر التغيير في الابنية في العراق باستخدام خارطة التعرج الادراكية == Managing variation orders in Iraqi buildings by using fuzzy cognitive map

Author name: حسن كمال محسن الحلي
Supervisor name: Sedqi Esmaeel Rezouki
General topic: Civil Engineering
Degree: Doctorate
Language: English
University location: Baghdad

تحري سلوك السقوف الخرسانية المسلحة احادية الاتجاه ذات التسليح المربط المتاثرة بلهب الحريق == INVESTIGATING THE BEHAVIOR OF ONE-WAY REINFORCED CONCRETE LACED SLABS AFFECTED BY FIRE FLAME

Author name: انس ابراهيم عبد الله
Supervisor name: شذى ضياء محمد الخزرجي
General topic: Civil Engineering
Degree: Master
Language: English
University location: Baghdad

السلوك الانشائي للعتبات الخرسانية الجيوبوليمرية المسلحة بالالياف تحت تاثير الاحمال الساكنة والتكرارية == Structural Behavior of Fiber Reinforced Geopolymer Concrete Beams Under Static and Repeated Loading

Author name: زينب عادل محمد
Supervisor name: ليث عبد الباري الجابري | ارشد ناظم شبر
General topic: Civil Engineering
Degree: Master
Language: English
University location: Baghdad

تحليل قوى الرياح على الابنية العالية باستعمال تقنية ديناميكية الموائع الحسابية == High - Rise Building Wind Analysis Using Computational Fluid Dynamics

Author name: كرار وليد سعيد عبيد
Supervisor name: شيماء عبد المطلب هاشم | جاسم محسن عليوي
General topic: Civil Engineering
Degree: Master
Language: English
University location: Baghdad

سلوك البلاطات الخرسانية المسلحة بالالياف الفولاذية ذات الفتحات == BEHAVIOR OF STEEL FIBER REINFORCED CONCRETE (SFRC) SLABS WITH OPENINGS

Author name: مرتضى دفار عبد الرضا
Supervisor name: سامر محمد جاسب
General topic: Civil Engineering
Degree: Master
Language: English
University location: Maysan

التحليل العددي للعتبة الخرسانية - الفولاذية المركبة المنحنية في المخطط == NUMERICAL ANALYSIS OF STEELCONCRETE COMPOSITE BEAM CURVED IN PLAN

Author name: صبا ليث كريم
Supervisor name: عبد الخالق عبد اليمة جعفر
General topic: Civil Engineering
Degree: Master
Language: English
University location: Maysan

تطوير نظام تدريبي متكامل لتكوين مهندسين متعددي التخصصات في قطاع الانشاء العراقي == Developing an Integrating Training System to Form Multidiscipline Engineers in Iraqi Construction Sector

Author name: سهى فالح مهدي
Supervisor name: سوسن رشيد محمد
General topic: Civil Engineering
Degree: Doctorate
Language: English
University location: Baghdad

تاثير اللامركزية على المشاريع الانشائية في العراق == The impact of decentralization in construction projects in Iraq

Author name: عماد عيسى عبد الشبلاوي
Supervisor name: سوسن رشيد محمد
General topic: Civil Engineering
Degree: Master
Language: English
University location: Baghdad

تاثير الاختيار الامثل لنوع الركيزة على الزمن والكلفة والجودة للمشاريع الانشائية العراقية == optimal Effective choice of pile type on time, cost and quality for Iraqi construction projects

Author name: هناء حسين لطيف
Supervisor name: عباس محمد برهان
General topic: Civil Engineering
Degree: Master
Language: English
University location: Baghdad
First pages:

خطة ادارة شاملة لنظام تسليم مشاريع الصرف الصحي == Comprehensive Management Plan for Wastewater Projects Delivery System

Author name: اثير محمود توفيق السعدي
Supervisor name: صدقي اسماعيل رزوقي
General topic: Civil Engineering
Degree: Doctorate
Language: English
University location: Baghdad
Key words:
  • Comprehensive Management Plan
  • Wastewater Projects
  • Projects Delivery System
  • Agile Methodology
  • Geographic Information Systems
  • Artificial Neural Networks
First pages:
Abstract: One of the main reasons for the poor management of infrastructure projects is their complex nature, especially wastewater projects WWPs, and their reliance on traditional delivery systems in implementation, as well as a lack of acceptable techniques and methodologies to manage the delivery system, which negatively affects project performance in terms of cost, time and quality. The success of WWPs depends on select the optimal delivery system. This research aims to prepare a comprehensive management plan CMP for wastewater project delivery system using agile methodology. To achieve the aim of research, personal interviews with experts and a relevant literature review were conducted to collect the data. After that two forms of questionnaire were prepared, the questionnaire No. (1) was distributed on twenty projects under construction in the city of Alkut to determine the affecting factors on PDS selection, in addition affecting risks on PDS. While the questionnaire No. (2) was distributed to ten experts for conducting pairwise comparisons between the main factors on the one hand, and secondary factors on the other hand. The field survey was conducted using Geographic Information Systems GIS to determine the requirements of WWPs for unserved areas by develop two mathematical models using Multiple Linear Regression MLR techniques. The result analysis showed there are three main factors affecting on PDS selection such as project objective, owner requirement, and external conditions. The first main factor includes 15 sub factors, and three sub factors were selected based on relative importance index RII, they are (f3, f5, and f1) by (92.6%,90.6% and 84%) respectively. The second main factor includes sixteen sub factors, and (w1 and w3) were selected by RII (86.65% and 79.4%) respectively. The third main factor includes eight sub factors, and three sub factors were selected (m7, m2, and m1) by RII (86.9%, 82.9%, and 82.3%) respectively. These factors were adopted in design of conceptual model using AHP technique, the IV results showed that the optimal delivery system is (design-build) by highest degree of priority (Si) its (0.405) and the appropriate contract for this system is price incentive by AM (3.4). The proposed CMP was prepared using agile methodology, which consist of two main stages, planning and design stage, where the vision included identifying the requirements of WWPs, cost estimation, time estimation, and risk management plan using artificial neural networks ANN, and risk score method. While the construction stage, the vision included a set of proposed procedures to achieve roles of owner, contractor, and consultant. Thus, the proposed CMP was evaluated by a questionnaire was distributed to a group of experts, the results showed that the plan is applicable and its ability to manage the delivery system is good. Finally, the current research extracted a set of conclusions, the most important ones the optimal delivery system for WWPs is design-build. Several recommendations were suggested, the most important one is the rehabilitation and training of planners and decision-makers on recent methodologies and techniques related to mathematical models and statistical equations in the process of managing the delivery system.
Full text:
Summary:
References:

تقييم وتحسين منهجية ادارة الاتصالات في المكاتب الاستشارية الهندسية للجامعات العراقية == Assessment and Improvement Methodology of Communication Management in Engineering Consultant Bureaus at Iraqi Universities

Author name: اثير محمود توفيق محمود
Supervisor name: فراس خيري جابر | طارق عبد المجيد خليل
General topic: Civil Engineering
Degree: Master
Language: English
University location: Baghdad
Key words:
  • Assessment
  • Communication Management System
  • Engineering Consultant Bureaus
  • Improvement
First pages:
Abstract: The communication management system(CMS) plays an active role in Iraqi consultant bureaus , the work of consultant bureaus characterized by a special nature which includes many barriers in the communication field such as a technical and financial barriers and the barriers that are related to communication management system efficiency (CMSE) . The purpose of this study is to asset and improve the communication management system in the engineering consultant bureaus , through the personal interviews that were conducted by the researcher with a group of engineers and consultants in the engineering consultant bureaus , has been identified a problem that is represented by high cost , time delay and weak performance due to use of traditional communication tools . A questionnaire form was prepared and distributed among fifteen(15) consultant bureaus in Iraqi Universities that represent population study , one hundred fifty (150) form were distributed and sixty eight (68) forms were received , and then analyzed statistically by statistical packages for social science (SPSS) program during the period between December /2015 till April/ 2016. The data were analyzed , the most of communication technology used in the consultant bureaus was the mobile at rate (82.35%) , and Facebook was the most social media used at rate (50%) , in addition (78%) of study sample confirmed that there were department to communication management system in the consultant bureaus , and (97%) of the study sample confirmed there are no program in the bureaus to train the engineers in the communication management system , the study refers to that the paper post is the most commonly used among consultant bureau and the top administration and the bureau and customer at rate (64.4%) , (50%) respectively . In order to evaluate and improve the communication management system , many solutions and suggestions were put to reduce the barriers that face these bureaus in the field of communication , by making communication management program(CMP) that is made by using (Visual Basic) language , through deriving a two main equations to measure the efficiency and the barriers of communication management system(CMS). III The (CMP) was verified by an evaluation questionnaire that was distributed among fifteen (15) engineers, it shows the result that all of study samples (100%) referred to the easy use of the program , and (73%) of study sample confirmed that the program discusses three issues of time , cost and performance , while the result showed half of study sample confirmed the accuracy of (CMP) to assess reality of CMS , then the analyzed result showed that (53%) of study sample shows that program is very good for both raising the performance among the staff of the C.B in the terms of importance . The program was applied to five consultant bureaus for the purpose of validation the program , and the researcher found the C.B of Al-Kufa University got a highest degree in (CMSE) and lower degree in (CMSB) , while the C.B of Diyala University got a lower degree in CMSE and higher degree in CMSB . The CMSE is increasing when reapplied the CMP and after taking in consideration the proposed tools in CMP . Finally the researcher can be rebuild the CMP by (HTML) in order to be available for all .
Full text:
Summary:
References:

المطالبات في المقاولات الانشائية في العراق == claims in construction contracts in iraq

Author name: اكسانه جهاد محمد
Supervisor name: احسان شيرزاد
General topic: Civil Engineering
Degree: Master
Language: Arabic
University location: Baghdad
First pages:

تسعير وتخمين كلف المشاريع الانشائية : المشاريع النفطية في العراق == pricing & estimating of construction projects oil projects costs iraq

Author name: مها جميل الريس
Supervisor name: محمد ايوب صبري الغزي
General topic: Civil Engineering
Degree: Master
Language: Arabic
University location: Baghdad
First pages:

تطوير نموذج تقدير تكلفة المخاطر الاحتمالية باستخدام محاكاة مونت كارلو في مشاريع البناء العراقية == Developing A Probabilistic Risk Cost Estimation Model Using Monte Carlo Simulation in Iraqi Construction Projects

Author name: حنين زياد فائق الزبيدي
Supervisor name: طارق عبد المجيد خليل
General topic: Civil Engineering
Degree: Master
Language: English
University location: Baghdad
First pages:

دراسة تاثير طرق المعالجة على الركام الصناعي خفيف الوزن المقوى بالالياف وتاثيرة على خواص الخرسانة خفيفة الوزن == Study the Influence of Curing Methods on Fiber-Reinforced Cold‐Bonded Artificial Lightweight Aggregate and Its Effect on Lightweight Concrete Properties

Author name: حوراء احمد صبر
Supervisor name: وليد عبد الرزاق عباس
General topic: Civil Engineering
Degree: Master
Language: English
University location: Baghdad
First pages:

نظام ادارة الصيانة للرصف المرن في العراق == Maintenance Management System for Flexible Pavement in Iraq

Author name: علاء خرباط شذر
Supervisor name: احمد محمد رؤوف محجوب
General topic: Civil Engineering
Degree: Doctorate
Language: English
University location: Baghdad
First pages:

استخدام المخلفات الانشائية في اعادة اعمار المشاريع المدمرة في الحرب == UTILIZATION OF CONSTRUCTION WASTE IN RECONSTRUCTION OF WAR-DESTROYED PROJECTS

Author name: اوس سلوان نعمان
Supervisor name: Angham E. Al-Saffar
General topic: Civil Engineering
Degree: Master
Language: English
University location: Baghdad

مقترح نظام سيطرة نوعية لتنفيذ ركائز حفر ذات الاقطار الكبيرة باستخدام البنتونايت العراقي

Author name: ابراهيم عبد الله عيدان
Supervisor name: غانم عبد الرحمن بكر
General topic: Civil Engineering
Degree: Doctorate
Language: Arabic
University location: Baghdad
First pages:

تحليل المعولية للفحوصات المختبرية وفق 17025 ISO == Reliability analysis for laboratory tests based on ISO 17025

Author name: حيدر علي حمود
Supervisor name: رائد سليم عبد علي | علي عطية جبر
General topic: Civil Engineering
Degree: Master
Language: Arabic
University location: Baghdad
First pages:

تحسين دور مدير المشروع في تسليم الفقرات الانشائية باستخدام نظام الخبير == Improving the Role of Project Manager for Delivering the Construction Activities Using Expert System

Author name: رائقة فائق نجيب
Supervisor name: رائد سليم عبد علي
General topic: Civil Engineering
Degree: Master
Language: English
University location: Baghdad
First pages:

تاثير ضعف ادارة المخاطر على مدة تنفيذ المجمعات السكنية في العراق == The Effect of Inadequate Risk Management on Execution Time of Residential Complexes in Iraq

Author name: مهند احمد فليح الطائي
Supervisor name: طارق عبد المجيد خليل
General topic: Civil Engineering
Degree: Master
Language: English
University location: Baghdad
First pages:

بناء نظام للتنبؤ بمدة انجاز مشاريع الابنية المدرسية الحكومية في مرحلة الاحالة باستخدام الشبكات العصبية == Developing a Prediction Model for Public School Building Projects Completion Time at Contract Assignment Stage Using ANN

Author name: مصعب فالح حسن
Supervisor name: زياد سليمان محمد خالد | رائد سليم عبد علي
General topic: Civil Engineering
Degree: Master
Language: English
University location: Baghdad