Share

بناء انموذج رياضي لتجزئة التخطيط الاجمالي (DISAGGREGATE) مع تطبيق == Building A Mathematical Model To Fractionation The Total Planning (DISAGGREGATE) With Practical Application

Author name: وعود سالم عباس
Supervisor name: عبد الجبار خضر بخيت
General topic: Administration and Economics
Specific topic: Operations Research
Degree: Master
University: University of Baghdad - Faculty Of Administration And Economics - Department Of Statistics
Language: Arabic
University location: Baghdad
First pages: 07T4170 - p.pdf
Abstract: تناولت الدراسة موضوع تخطيط الانتاج الاجمالي لشركة الفداء العامة التابعة لوزارة الصناعة والمعادن من خلال تجميع جميع منتجات هذه الشركة التي تشترك بعضها بالبعض الاخر ضمن خصائص وقت التنصيب ووقت الانتاج وكلف الخزين على شكل ثلاث عوائل انتاجية هي (الاسطوانات اله | The study Addressed the total production planning to the fadaa public company redemption of the Ministry of Industry and Minerals by grouping all the products of this company that share to each other the other part of the time of installation and production time characteristics and cost inventories on three families of productivity is a form (hydraulic cylinders, Aldblatt (dampers), wiring, hydraulic ) by building a mathematical model based on a set of strategies for overall planning for the purpose of optimization of the potential productivity and reduce costs through the production process style of programming integers and unity of time, measured month. Also it addressed the issue of fragmentation of the total production planning (fragmentation of families) to the main purpose of their products to meet the demands of customers relying on the main indicators of the first model as inputs to tsecondmodeandStatement of distractions during the implementation of production lines, which depends on the first mathematical model outputs to reduce distractions for a total of one family products during the implementation of production lines and accelerate the process of implementation of the products on time through the use of proper programming setup using linear programming method within a week Transaction It serves as a so - called production schedule chairman, and through the application of the models show that the total costs of the company in accordance with the mathematical models used was (361,407,800) million while the cost of the company executing the plan and the duration of time itself in 2014 has reached (390 330 100) million, a difference of (28,922,300), and this is evidence of optimization models for production planning.
Logo