نموذج نضج ادارة المشروع : تصميم وحوسبة وتطبيق : دراسة حالة في عينة من شركات وزارة الاعمار والاسكان في العراق == Project Management Maturity Model : Designing , Computerizing And Application Case Study On A Sample of The Ministry of Construction And Housing Companies In Iraq
Author name:
زهرة عبد محمد الشمري
Supervisor name:
صباح مجيد سعيد النجار
General topic:
Administration and Economics
Specific topic:
Business Administration
Degree:
Doctorate
University:
University of Baghdad - Faculty Of Administration And Economics - Department Of Business Administration
Language:
Arabic
University location:
Baghdad
First pages:
07T274 - p.pdf
Abstract:
ان ادارة المشروع الناجحة هي ميزة متواصلة في الصيغة الديناميكية لمنظمات اليوم في مختلف المجالات، حيث تتحول المنظمات والشركات الهادفة وغير الهادفة للربح الى ادارة المشروع لتحقيق الاهداف الاستراتيجية للمنظمة او الشركة. اذ تمثل ادارة المشروع الكفاءة التنظيمي | A successful project management is a constant distinctive mark in the dynamic formula of today’s organizations in different fields wherein objective and nonobjective organizations and companies from diverted profit to project management to achieve strategic goals for the organization or for the company. Project management represents a unique systematic proficiency which runs the changes and pushes the organizations and companies to a remarkable competition and consequently achieves results according to the company’s strategy. Because of the importance of the project management, several institutes and specialized entities in project management submitted number of project management maturity models which aim to determine the level of the project management maturity in organizations and companies. However, there is still a need to submit a perfect maturity model containing the characteristics which the other international models have; besides the characteristics the models have ignored in addition to some characteristics submitted by writers and researchers to be a guide that helps organizations and companies to assessment the level of the project management maturity and to continue improving it. The study aims at designing a project management maturity model and then to apply it to a sample company of the Ministry of Construction and Housing. The study also aims at designing a system for evaluating assessment the level of the project management maturity by using programming languages (Microsoft Visual Basic 6.0) and Data Base (Microsoft Access) to construct the data base system. in order to calculate the average level of the project management maturity and to count the two indicators of cost and scheduling performances, and in the light of them particular basics will be deterring the projects are classified according to excellent , success and challenge. as well as detraining the failing projects in some of the excellent , successful and challenged by the management of the project and high administration The system has been designed in a general form and it is not confined to handling the case related to the sample study.An example case is taken from the Ministry of Construction and Housing to fulfill the aims of the study, the method of studying was taken into account so as to obtain all the required data and information to apply a sample project management maturity in it.The researcher, together with teams of evaluation in the companies dealt with, performed the evaluation of the level of the project management maturity and using the project maturity level evaluation system afterwards to determine the level of project management maturity and to determine the indicators of cost performance and scheduling performance and classifying companies’ projects to several categories as well putting a plan to improve the level of the project management maturity in the companies dealt with.The study has reached several conclusions such as : The results of the study showed that the studied companies have achieved the level of project management maturity distributed between the two levels (1) and (2) of maturity which pointed out that the contracting companies in the Ministry of Construction and Housing are still in the beginning of maturity because they did not apply the concepts and philosophies related to the project management maturity and The results of the circumstances the constructional industry sector went through. The study recommends adopting the application of the Project Management Maturity Model (PM3) in the companies studied to see the truth of the project management maturity in them to be the starting point to improve the project management maturity which calls to adopt the guide of the Project Management Body of Knowledge (PMBOK) to realize activities which include plans, procedures, jobs, activities, rules and methods and ways related to each operation of the project management operations