حل مشكلة النقل في ظل قيود ميزانية الشركة مع تطبيق عملي == To Solve The Transportation Problem In Light of The Company'S Budget Restrictions With Practical Application
Author name:
عفراء عباس حمادة
Supervisor name:
سميرة خليل ابراهيم
General topic:
Administration and Economics
Specific topic:
Operations Research
Degree:
Master
University:
University of Baghdad - Faculty Of Administration And Economics - Department Of Statistics
Language:
Arabic
University location:
Baghdad
First pages:
07T3856 - p.pdf
Abstract:
تعتبر مشكلة النقل احد الاساليب الرياضية المهمة التي تساهم في عملية اتخاذ القرار المناسب في نقل السلع من مصدر انتاجها او تجهيزها الى مراكز طلبها المتعددة باقل التكاليف الممكنة, وضمن حدود العرض والطلب في كافة المنشات الصناعية, الاقتصادية والانتاجية. وفي ه | The problem of transportation is one of the important sports methods that contribute to the decision - making process in the transfer of goods from the source of production or processing to the centers of multiple demand at the lowest possible costs, and within the supply and demand in all industrial, economic and productivity. In this thesis, a model was presented for the problem of unbalanced transportation within budget constraints and demand for specific periods with a lower limit and an upper limit. This model was solved using the Interval point method to find the optimal solution to the problem of transportation with budgetary constraints. Which contributed to the selection of suitable solution for administrative and economic decision makers according to their potential and financial availability, as well as the use of the zero - point method to solve the linear model of the problem of transportation proved to be efficient and easy to apply. The simplex programming method was used to solve the transportation problem For. This method has proven to transportation larger volumes and lower transportation costs for Lower and Upper demand but exceeded the budget allocated by the company to transportation the product. The total transportation cost of the black oil (fuel oil) in the way of the Interval point method to the lower limit (187700000) and the cost of the upper limit (247600000) and did not exceed the budget allocated for transportation from the company (225500000), but reduced the cost of transportation to (22557808) (9,705.47) tons. The general linear programming method (Simplex) was the lower limit cost (180280000) and the cost of the upper limit (240000000) and the total cost of transportation was (233097.76) exceeded the budget allocated for transport by the company by (7597.76) and quantities transferred (10004.09) tons.